Lighting automation

A lighting study that meets EN 12464-1
in minutes.

01Upload your plan
02Choose your zones
03Click Calculate
04Standards-compliant study
News Visit us at Digital Construction Day · 13 October 2026 · Brussels Gate · stand #3
How it works

How Momik works.

One calculation engine, two ways to work: in the browser or from your Revit model. The same study, calculated against EN 12464-1.

In the browser

Nothing to install. Draw or upload your zones, calculate, receive your report — on any device. For engineering firms and installers without BIM.

Create free account →
app.momik.ai · live result
Momik editor: new project with a blank canvas, ready to draw a room

As a Revit plugin

Your model supplies the zones; Momik calculates in the cloud and places the chosen luminaires back as families, with photometry linked. Available now.

See the Revit sync →
Revit pluginAutodesk Revit · Momik plugin
Momik plugin room list in Revit — each room with its lighting function
web platform Revit plugin rooms · zones · geometry .rfa families · .ldt photometry · results

One calculation engine, one catalog. Work in the browser or straight from Revit — both are available today.

From plan to report in four steps.

step 1

Draw or upload your zones

Import your floor plan or draw your zones — each type automatically gets the right standard values.

step 2

Filter the catalog

Set your requirements — lux, UGR, IP, CCT, CRI, mounting — and the catalog keeps only what truly fits.

step 3

Click Calculate

One click, one complete study: illuminance, uniformity, UGR and isolux per zone.

step 4

Receive your report

A standards-compliant PDF report with heatmaps, luminaire list and results per zone — ready for your quote.

Our calculation engine

Lighting calculation software that runs in the browser.

Draw, calculate, view in 3D. This is the real Momik editor — not a mockup, and nothing to install. A sample study, run on the same calculation engine you use in the app: standards-compliant, with isolux heatmap and 3D.

Create free accountOpen the full app →

Neutral comparison

Three suppliers. One study. The same assumptions.

Momik is not a manufacturer. Same room, same standard, same grid — the calculation method, maintenance factor and grid spacing you would set in DIALux or Relux. You compare three suppliers purely on the numbers, not on their brochures.

Supplier A2850 lm · 26 W
Supplier B3000 lm · 25 W
Supplier C2900 lm · 29 W
Ēm
513 lx
540 lx
522 lx
Luminaires
12 (4×3)
12 (4×3)
12 (4×3)
Power
312 W · 6.70 W/m²
300 W · 6.44 W/m²
348 W · 7.48 W/m²
Efficiency
110 lm/W
120 lm/W
100 lm/W
UGR (datasheet)
≤ 19
≤ 19
≤ 19
List price excl. VAT
€1,416
€1,620
€1,140

Example: office 46.6 m² · 500 lx · MF 0.787 · 600×600 LED panels, 12 per supplier in a 4×3 grid, calculated with the Momik calculation engine. Prices illustrative — your study shows the current catalog price.

For BIM teams · available now

A Revit lighting plugin that syncs both ways.

Working in Revit? The Momik plugin reads your model, calculates in the cloud and places the chosen luminaires back as families — with the right photometry linked. Available now, alongside the web version.

Autodesk Revit · Momik plugin · example
Model readfloor 2 · 14 rooms
Zones synchronized14 / 14
Calculationcompleted
Families placed back72 luminaires · .rfa + .ldt
Roadmap

Lighting is the beginning. Momik is becoming full MEP.

The same approach — standards-compliant calculation, normalized catalog, report in minutes — we're rolling out across the following disciplines. Built by engineers who make these studies themselves.

Available

Lighting

Complete lighting studies with zone cascade, supplier comparison and a standards-compliant report. Emergency lighting: next.

your country's standardautomatic, by project address
Create free account
In development

HVAC

Ventilation flow rates per room type, EPB-compliant flow calculation and air handling unit selection from the catalog.

your country's standardautomatic, by project address
Notify me
In development

Plumbing

Pipe sizing for drainage and supply, with automatic DU values per fixture and a bill of materials.

your country's standardautomatic, by project address
Notify me
Team

The people behind Momik.

A small team that works in the construction and lighting world itself — from standards and calculation to code.

Ali Safieddine

Ali Safieddine

Founder · Revit & Data

Builds the Revit integration and the database behind Momik.

Artak Khachatryan

Artak Khachatryan

Founder · CEO

Drives the business and customer acquisition — a market expert who uses these tools himself.

Tigran Khachatryan

Tigran Khachatryan

Later co-founder · Web & AWS

Builds the web apps and the AWS infrastructure.

FAQ

Questions we get about lighting calculations.

Short answers on the standard, the platforms, the catalog and the price. If yours is not here, ask us below — we answer within the working day.

Is the report EN 12464-1 compliant?

Yes. Momik calculates maintained illuminance, uniformity (Uo) and UGR per zone and checks each one against the standard values for that room type. The report lists the result zone by zone, so the compliance is readable instead of assumed.

Does Momik run on Mac?

Yes. The web version runs in the browser, so macOS, Windows and Linux all work and there is nothing to install. The Revit plugin is the exception: it runs wherever Revit runs, which is Windows.

Is Momik a DIALux alternative?

For the compliant study, yes. Momik runs in the browser on any operating system, where DIALux evo lists Windows 10 and 11 as its system requirement, and it compares luminaires from several suppliers inside one study. It is not a full replacement: DIALux evo is free and covers far more scenarios — outdoor, daylight, emergency lighting. Momik is built for the compliant indoor study.

Does it work with Revit?

Yes. The Momik plugin reads your model, calculates in the cloud and places the chosen luminaires back as Revit families with their photometry linked. It is available now, alongside the web version.

Is the luminaire catalog brand-neutral?

Yes. Momik is not a manufacturer. Every luminaire in a study is calculated from its real IES or LDT photometric file, so you compare suppliers on measured numbers — illuminance, power per m², efficacy, UGR and list price — instead of on their brochures.

How long does a lighting study take?

Minutes. Four steps: upload or draw your zones, filter the catalog, click Calculate, receive your report. The calculation itself runs in the cloud, so nothing on your machine has to keep up.

What does Momik cost?

Momik is free until 12 October 2026. From then, Lite is €79/month and Pro €229/month, billed yearly (or €99 and €279 billed monthly), excl. VAT. Both start with a 14-day free trial. Enterprise starts at €1,250/month.

Ready to accelerate?

Your next lighting study doesn't have to take three weeks.

Ask us anything or book a 20-minute demo. Bring a real plan — we'll calculate it live.

We use your details only to answer this message. See our privacy policy and cookie policy · .

Come visit us at Digital Construction Day · October 13, 2026 · Brussels Gate · stand #3